Eaton Managed Rack PDU EMA326-10

200–240 V three-phase, 30 A L15-30P input (24 A operating load); 18 C13 + 6 C19 managed outlets; 0U. This static record covers the named model only; confirm complete regional suffix, revision and nameplate before installation.

Original local schematic of Eaton Managed Rack PDU EMA326-10; not a product photo or wiring diagram
LOCAL FUNCTIONAL SCHEMATIC // NOT TO SCALE

ARCHIVAL IDENTIFICATION: EMA326-10. Record the complete label, serial/date code, firmware and condition; similarly named models are not electrically interchangeable.

Exact model specifications

SKU / topologyEMA326-10 — networked switched rack power distribution unit; no UPS battery or stored runtime.
Input and output voltage200–240 V AC input and output (3-phase supply; confirm the system voltage/nameplate)
Phase / ampacityThree phase; 30 A input connector class, 24 A maximum operating load; 8.64 kW class at 208 V three-phase.
Outlet count and type24 total: 18 × IEC 60320 C13 and 6 × IEC 60320 C19
Metering / outlet switchingManaged/switched ePDU with outlet-level remote control and metering; confirm per-outlet monitoring/control scope from the selected firmware/specification revision.
Network managementEthernet network management and remote switching/monitoring; Eaton ePDU management software and network protocols vary by controller/firmware.
Rack dimensions0U vertical rack installation; full-height format, mounted along rack side rails. Confirm length, depth and clearances from the model installation documentation.
Plug and load compatibilityNEMA L15-30P three-phase input plug; requires matching grounded 200–240 V three-phase L15-30R service. C13 accepts C14 and C19 accepts C20 equipment inlets; verify phase/voltage for each load.
Electrical safetyMatch the three-phase source, connector, phase sequence and protective-earth arrangement to the complete nameplate and local electrical code; 24 A is the stated operating load, not 30 A continuous. Do not use adapters or energize with damaged connectors. Installation by a qualified electrician.

Service and safe deployment

  • Verify voltage, phase, inlet plug, circuit ampacity, continuous load and per-outlet ratings against the PDU nameplate and the exact product manual.
  • Use grounded, correctly protected service; never defeat the protective-earth conductor, overload an outlet/bank, or daisy-chain power strips/PDUs.
  • Mount the chassis using the manufacturer-approved brackets and preserve ventilation and strain relief. Inspect cord, plugs, receptacles and enclosure for heat, wear or damage.
  • Disconnect upstream power before installation, relocation or service. Do not open energized mains equipment; use a qualified electrician where required.
  • Network management can switch power to connected systems; isolate management access, set unique credentials and verify firmware before deployment.

Manufacturer sources and manual

  1. Manufacturer product page — Eaton Managed Rack PDU EMA326-10Manufacturer model listing and configuration details; match the complete SKU and region. Original page is gone; this is the Internet Archive’s copy.
  2. Manufacturer documentation — EMA326-10 manufacturer specifications and technical dataManufacturer manual, technical data or specifications; use the revision applicable to the unit label and follow its installation and safety directions. Original page is gone; this is the Internet Archive’s copy.