[ NETWORKED / SWITCHED RACK PDU // EXACT SKU ]
CyberPower PDU41102 Switched PDU
120 V single-phase, L5-30P 30 A input (24 A continuous); 24 switched NEMA 5-20R outlets; 0U. This static record covers the named model only; confirm complete regional suffix, revision and nameplate before installation.
ARCHIVAL IDENTIFICATION: PDU41102. Record the complete label, serial/date code, firmware and condition; similarly named models are not electrically interchangeable.
Exact model specifications
| SKU / topology | PDU41102 — networked switched rack power distribution unit; no UPS battery or stored runtime. |
|---|---|
| Input and output voltage | 100–120 V AC input and output |
| Phase / ampacity | Single phase; 30 A input, 24 A maximum continuous load (UL derated) |
| Outlet count and type | 24 × NEMA 5-20R receptacles; switched |
| Metering / outlet switching | LCD/local monitoring, remote outlet switching/cycling, power sequencing and two 20 A output banks. |
| Network management | RJ45 Ethernet network management with browser/SNMP control and event notifications; optional environmental sensing requires the supported sensor. |
| Rack dimensions | 0U vertical rack-mount format; full-height side installation; verify PDU length and rack side-channel clearance in the model-specific installation instructions. |
| Plug and load compatibility | NEMA L5-30P input requires a grounded 120 V single-phase L5-30R receptacle and appropriately protected circuit. NEMA 5-20R outlets accept 5-15P/5-20P plugs within their branch and per-bank limits. |
| Electrical safety | 30 A inlet is limited to 24 A continuous; obey two 20 A bank protections and nameplate ratings. Retain protective earth, secure the vertical unit and keep cable strain off the inlet. No adapters or energized maintenance. |
Service and safe deployment
- Verify voltage, phase, inlet plug, circuit ampacity, continuous load and per-outlet ratings against the PDU nameplate and the exact product manual.
- Use grounded, correctly protected service; never defeat the protective-earth conductor, overload an outlet/bank, or daisy-chain power strips/PDUs.
- Mount the chassis using the manufacturer-approved brackets and preserve ventilation and strain relief. Inspect cord, plugs, receptacles and enclosure for heat, wear or damage.
- Disconnect upstream power before installation, relocation or service. Do not open energized mains equipment; use a qualified electrician where required.
- Network management can switch power to connected systems; isolate management access, set unique credentials and verify firmware before deployment.
Manufacturer sources and manual
- Manufacturer product page — CyberPower PDU41102 Switched PDUManufacturer model listing and configuration details; match the complete SKU and region.
- Manufacturer documentation — PDU41102 User ManualManufacturer manual, technical data or specifications; use the revision applicable to the unit label and follow its installation and safety directions.